Preempt Global — Pre-Bid Construction Document Review
Preempt

Full-Lifecycle Document Review

Your contractor reads your CDs looking for money. We read them looking for mistakes.

Design to CO: Unlimited reviews, 48-hour turnaround, one fixed fee

Issues caught at design cost $0 to fix. At permit: $1K–$5K. At bid: $5K–$50K. In the field: $20K–$200K+. One finding pays for your entire engagement—most projects find several.

Start Here See how it works → Consistent review from conception through closeout. $11K–$27K depending on project size.

What you get

Unlimited Reviews
Design, permit, bid, construction, closeout. One active at a time, 48-hour turnaround.
Written Report
Specific findings, severity tiers, exact references to drawings & specs
1-Hour Call
Walk through findings and next steps directly with the reviewer
Cost Prevention
Catch issues at every phase. Cheaper to fix early than in the field.

The Problem

Your architect reviews their own work. Your contractor reads for gaps. Nobody reads to protect your budget.

The architect's QC verifies design intent was captured. The contractor reads for things they can exploit. You're the only party without incentive to ignore problems.

Most projects don't get independent review at any phase. Design issues cascade. Permit issues compound. Bid issues get priced as contingency. Field issues become change orders.

Fixed at each phase
Design: $0. Permit: $1K–$5K. Bid: $5K–$50K. Construction: $20K–$200K+.
~50%
of change order items traceable to earlier phases

How It Works

Unlimited reviews. One fixed fee. Conception to CO.

1

You send documents at any phase

Design, permit, bid, construction, or closeout. We review and turn around in 48 hours.

2

We read from the contractor's chair

Drawing-to-spec cross-check. Trade conflicts. Scope gaps. Long-lead items.

3

Written report, severity-tiered

Each finding names the drawing, spec section, what happens if unfixed, and the cost.

4

1-hour walkthrough call

Go through every finding and discuss next steps—RFI, revision, or acceptance.

The value
$11K–$27K
One project. One fixed fee. Unlimited reviews across all phases. Most projects find several issues, with even one typically paying for the entire engagement.
Design issue found: $0. · Same issue in the field: $100K+.
Why consistency matters
Your project has one reviewer across all phases. Same eyes on design, permit, bid, construction. Consistent catch of what slips through.

What We Catch

Organized by what costs you money.

Turns Into Change Orders
Spec vs. drawing conflicts
CRAC unit voltage mismatch → 12–20 week re-order
Generator size vs. fuel runtime spec
Panel schedule vs. feeder capacity
Contractor prices the ambiguity.
Means Field Rework
Coordination gaps
Ducts running through beams
Structural/MEP conflicts
Plumbing routed through walls
Hundreds of feet of rework. Tens of thousands in cost.
Causes Schedule Slip
Undefined scope
Long-lead items not flagged
Commissioning party undefined
RFI procedures unclear
RFIs cascade. Every week of delay costs money.
Complete Omissions
Sometimes it's an absence.
Backup power, fire suppression, commissioning authority. Recent example: no UPS or emergency generator in a 133-sheet data center package. $150K–$400K of unspecified scope caught before contract.

Why Preempt

Run by an architect who draws the documents he reviews.

Fully Aligned
Every other party profits from silence
We don't. Your budget is our only client.
No architect firm to protect. No contractor relationship.
Specific, Not Vague
Every finding has context
Drawing reference, spec section, what it costs in the field.
No hedging. Every finding has consequence and fix.
48 Hours, Virtual
No travel. No committees.
Nationwide, from your documents to report in 48 hours.
Fits any timeline and approval authority.
Insider Knowledge
He still draws these documents
Every week at a large architecture firm. The gap closes to zero.
Someone who never stopped making them.
Proven Findings
26
Issues
6
Critical
112
Max Days at Risk
$628K
Max Exposure
On one publicly available bid set. Nobody else had flagged it.

Pricing

One price. Every phase. From design to CO.

Unlimited document reviews throughout your project — design, permit, bid, construction, closeout. One fixed fee. $11,000–$27,000 depending on project size and type.

$11,000–$27,000
Project-wide document review
One finding pays for this entire engagement. Most projects find several across all phases.
What's Included
Design
Catch intent misses before they cascade
Permit
Find compliance gaps early
Bid
Flag issues before contractors price ambiguity
Construction
Catch conflicts before field rework
Closeout
Verify compliance before CO
Unlimited reviews (1 active at a time)
48-hour turnaround per review
NDA signed before documents
Full scope, no page limits
Written report + walkthrough call
Why This Works
Most projects find 12–17 budget and schedule impacting issues. One finding pays for the entire engagement. Average total error, omissions and mis-coordinated item findings total $158K–$643K.
Our standard: If we don't find anything worth fixing, we'll tell you honestly.
Book Your Project Review

Questions about scope? We'll discuss during your initial 20-minute call.

Ready?

Catch it on paper.

Send your CDs at any phase. Design, permit, bid, construction, or closeout—unlimited reviews, one fixed fee.

Design issue fixed: $0. Same issue in the field: $100K+.